From Building Blocks to Case Studies: Estimating the Costs of Transport and Storage for East Coast Australia

Title: From Building Blocks to Case Studies: Estimating the Costs of Transport and Storage for East Coast Australia
Authors: Neal, PR; Ho, MT; Weihs, GAF; Wiley, DE
Contributors: Dixon, T; Laloui, L; Twinning, S
Source: urn:ISSN:1876-6102 ; 13th International Conference on Greenhouse Gas Control Technologies (GHGT), SWITZERLAND, Lausanne, 2016-11-14 - 2016-11-18
Publisher Information: Elsevier
Publication Year: 2017
Collection: UNSW Sydney (The University of New South Wales): UNSWorks
Subject Terms: 4005 Civil Engineering; 40 Engineering; 33 Built Environment and Design; anzsrc-for: 4005 Civil Engineering; anzsrc-for: 40 Engineering; anzsrc-for: 33 Built Environment and Design; anzsrc-for: 0904 Chemical Engineering; anzsrc-for: 0906 Electrical and Electronic Engineering
Description: CCS presents the opportunity to utilise Australia's coal and gas resources in an emissions constrained world. Through this study, we have undertaken the most comprehensive assessment to date of the practical equipment costs associated with transporting and storing CO 2 captured from power plants in Australia. The implementation of CCS in Australia will require a large transport and storage network involving pipelines, booster pumps, wells, storage site facilities and storage site monitoring. Such a network does not currently exist and needs to be built if CCS is to be deployed at scale. Excluding initial compression, the total plant costs for transport and storage of CO 2 from power plant emission hubs in Australia are estimated to vary from as little as $5-14/t injected for cases with short transport distance and good quality storage sites up to about $60/t injected for transport of large volumes of CO 2 over long distances to lower quality sites. These costs should not be confused with total project costs that include additional owner's costs of at least 15-40% for proving up storage sites, undertaking the required front end engineering and obtaining project approvals. The total project costs may also require extra risk-adjusted costs.
Document Type: conference object; report
Language: unknown
Relation: https://hdl.handle.net/1959.4/unsworks_62366; https://doi.org/10.1016/j.egypro.2017.03.1777
DOI: 10.1016/j.egypro.2017.03.1777
Availability: https://hdl.handle.net/1959.4/unsworks_62366; https://doi.org/10.1016/j.egypro.2017.03.1777
Rights: metadata only access ; http://purl.org/coar/access_right/c_14cb ; CC-BY-NC-ND ; https://creativecommons.org/licenses/by-nc-nd/4.0/
Accession Number: edsbas.5EBEEEDD
Database: BASE